Nou Camp Stadium – Fc Barcelona

Desde 1972 Fixed Facilities Nou Camp Stadium – Fc Barcelona Technology employed: 129 monitors were installed of different sizes (46, 40 and 32 inch) and placed among the three terraces of the stadium. The equipment and control system was connected using fibre...

Hotel Hesperia Tower

Desde 1972 Fixed Facilities Hotel Hesperia Tower Services performed Works carried out: Whole project: auditorium, pre-auditoria, pre-auditoria anterooms, mezzanine meeting rooms, multi-function cosmos rooms and congress space. Integrated maintenance for 3 years and...

Mediterranean Barcelona

Desde 1972 Fixed Facilities Mediterranean Barcelona Casa Daurada Works carried out: Equipping and audiovisual installation in Auditorium and Adjoining Rooms, exterior areas, bar-pool and Coco-Loco, leisure zone, terrace restaurant, spa, pizza restaurant, rooms 1 and...

New Installations Imo (Institute Of Ocular Micro Surgery)

Desde 1972 Fixed Facilities New Installations Imo (Institute Of Ocular Micro Surgery) Installation of equipment for an auditorium of 300 people, equipped with video, video conference, simultaneous translation and three operating theatres with monitors, cameras and...

Synchrotron Alba (Particle Accelerator)

Desde 1972 Fixed Facilities Synchrotron Alba (Particle Accelerator) Maxwell Auditorium in Synchrotron Alba Technology employed: Maxwell Auditorium, with capacity for 158 people, is equipped with retractable projection system with 3x2m electric screen, JBL 6 box sound...